News

Provide customers with high-quality hardware and electronic product services

Home  》  News  》  Industry News

Workflow of high -speed drilling machine

Time:2023-07-12 Preview:


Nowadays, high -speed drilling machines have been applied to industrial production. For the convenience brought about by production, high -speed drilling machines are widely used with their advantages of accurate processing, fast operation, simple operation, and high level of automation. They are mostly used for drilling. So how does a high -speed drilling machine work? Let's take a look at the analysis of Pinjia Xiaobian.

  1. Before turning on, press the lubricant to make the lubrication work, check whether the manipulation system is normal, flexible, and whether the safety device is complete and reliable.

Second, before the operation of high -speed drilling machines, the controllers control the handle in the air gear. With a manpower, there is no card resistance, and then the motor is carried out of the air load. It can only be operated after confirming that everything is normal.

Third, when adding drill rods, the special connection bolt should be uniformly fastened to ensure the sealingness at the connection and do a good job of cleaning at the connection. CNC drilling center machine

Fourth, when the high -speed drilling machine is turned on, the pulp should be delivered first and then drilling. When the drill is stopped, the drill should be stopped first and then the slurry should be stopped. The mass and the height of the slurry surface should be measured and adjusted at any time to ensure that the concentration is appropriate. When the drilling machine is stopped, the leakage should be supplemented in time.

5. When drilling the drilling machine at a high -speed drill, the drill pressure should be light, the speed should be slow, and the Shenzhen drilling machine is drilling in the process. According to the geological conditions and the depth of drilling, choose the appropriate drill pressure and drill speed, and give it evenly. When the gearbox is shifted, it should be stopped first, and the upper gear should be turned on.

6. The installation of the high -speed drilling machine and the assembly of the drill head shall be carried out in accordance with the instructions, when it is erected or placed in the drill rack. High -speed drilling machines should be carried out with skilled professional staff and should be removed at any time. In addition, keep the mud pure and the cycle is not interrupted to prevent collapse and buried drills.