Time:2023-07-14 Preview:
1. The maintenance cycle of refined carving equipment is generally set to be well maintained once in 3 months.
2. Open the X -axis cover, clean up the crumbs and dirt on the screw and rail (with silk), and insist on dry and regular.
3. Open the Z -axis cover and connecting the cover, clean up the screws, dandruff and dirt on the guide rail, check whether the Z -axis connection plate is loose, check whether the dragging chain connecting plate is loose, check the X -axis original point switch board and the collision board and Is the itinerary limit switch changed or not, and the screws are loose.
4. Remove the shot or shield on the Y -axis, clean up the screws, on the rail and dandruff and dirt, and the waste dandruff under the operating table must be cleaned up. Loose, whether it is reliable.
5. Check the connection of the connection cable.
6. Enter JDTEST to detect the signal bits, the characteristics of each axis trajectory, admit that after correctly, run in EN3D for 30 minutes, and the operation is normalized for timely maintenance!
·How to improve automation level in the field of stamping hardware processing ·On the Future Development of Hardware Parts · Precautions for CNC engraving and milling machines with single arm drilling and tapping machines ·There are four kinds of fire in metal die-casting proces ·How much do you know about the general principles of drafting process routes for CNC machining? ·What are the faults of the CNC lathe processing union ·How to improve the quality of high -precision parts processing in the hardware processing plant ·Advantages of non-standard automation ·Mold carving and milling machine characteristics ·The key to the improvement of high -speed processing center performance