Time:2023-07-14 Preview:
1. The maintenance cycle of refined carving equipment is generally set to be well maintained once in 3 months.
2. Open the X -axis cover, clean up the crumbs and dirt on the screw and rail (with silk), and insist on dry and regular.
3. Open the Z -axis cover and connecting the cover, clean up the screws, dandruff and dirt on the guide rail, check whether the Z -axis connection plate is loose, check whether the dragging chain connecting plate is loose, check the X -axis original point switch board and the collision board and Is the itinerary limit switch changed or not, and the screws are loose.
4. Remove the shot or shield on the Y -axis, clean up the screws, on the rail and dandruff and dirt, and the waste dandruff under the operating table must be cleaned up. Loose, whether it is reliable.
5. Check the connection of the connection cable.
6. Enter JDTEST to detect the signal bits, the characteristics of each axis trajectory, admit that after correctly, run in EN3D for 30 minutes, and the operation is normalized for timely maintenance!
·How to maintain the electrical system of CNC drilling machines in CNC machining centers CNC drilling ·What are the main objects for CNC lathe? ·Factors Affecting the Processing Price of Metal Die Casting Dies ·CNC's functional function ·The causes of bearing problems in CNC engraving and milling machines ·Structural characteristics of horizontal machining centers ·Test Test of CNC lathe characteristics ·Several reinforcement methods to improve precision hardware processing performance ·The main role of the connector contact plating using the electroplating process ·Carving and milling operating method