Time:2023-07-14 Preview:
1. The maintenance cycle of refined carving equipment is generally set to be well maintained once in 3 months.
2. Open the X -axis cover, clean up the crumbs and dirt on the screw and rail (with silk), and insist on dry and regular.
3. Open the Z -axis cover and connecting the cover, clean up the screws, dandruff and dirt on the guide rail, check whether the Z -axis connection plate is loose, check whether the dragging chain connecting plate is loose, check the X -axis original point switch board and the collision board and Is the itinerary limit switch changed or not, and the screws are loose.
4. Remove the shot or shield on the Y -axis, clean up the screws, on the rail and dandruff and dirt, and the waste dandruff under the operating table must be cleaned up. Loose, whether it is reliable.
5. Check the connection of the connection cable.
6. Enter JDTEST to detect the signal bits, the characteristics of each axis trajectory, admit that after correctly, run in EN3D for 30 minutes, and the operation is normalized for timely maintenance!
·Large CNC processing center processing ·Machining method of non -elevation precision parts for hardware processing plants ·What points should be paid attention to when dragon door milling processing and installation workpie ·CNC processing technology, although high -width ratio automation technology ·How to learn CNC processing center? ·How to Maintain CNC Turning and Milling Compound with CNC Computer Tools ·Do you know how to maintain the metal die casting mould? ·Rules for safe use of CNC machining centers ·Mold drilling center compared with the traditional cutting method ·Hardware die-casting