1. The maintenance cycle of refined carving equipment is generally set to be well maintained once in 3 months.
2. Open the X -axis cover, clean up the crumbs and dirt on the screw and rail (with silk), and insist on dry and regular.
3. Open the Z -axis cover and connecting the cover, clean up the screws, dandruff and dirt on the guide rail, check whether the Z -axis connection plate is loose, check whether the dragging chain connecting plate is loose, check the X -axis original point switch board and the collision board and Is the itinerary limit switch changed or not, and the screws are loose.
4. Remove the shot or shield on the Y -axis, clean up the screws, on the rail and dandruff and dirt, and the waste dandruff under the operating table must be cleaned up. Loose, whether it is reliable.
5. Check the connection of the connection cable.
6. Enter JDTEST to detect the signal bits, the characteristics of each axis trajectory, admit that after correctly, run in EN3D for 30 minutes, and the operation is normalized for timely maintenance!
·Application and characteristics of stamping parts processing parts spring ·What is the required coefficient standard for materials purchased by hardware die casting ·Basic knowledge of CNC milling machine programming stated in the machining center ·Processing Technology of Automobile Hardware Parts ·CNC selection ·CNC processing ·Correct Use and Maintenance of Die Casting Die for Hardware Parts ·Enhance the four methods of the quality of the surface layer of CNC parts ·When selecting the processing method, the following elements should be considered · Precautions for CNC engraving and milling machines with single arm drilling and tapping machines