1. After completing the daily work, first cut off the power supply and ensure that all surfaces, covers, guide rail surfaces, and screw threads of the CNC drilling machine are oil-free
Dirty, free of iron filings, and the surface of the drilling machine is clean.
2. Weekly maintenance is required for the cleanliness and lubrication of the bed guide rail surface. Usually, after a CNC drilling machine has been running for a period of time, maintenance needs to be carried out once.
The maintenance work is mainly carried out by operators with the cooperation of maintenance personnel. During maintenance, the power supply must be cut off first, and then maintenance must be carried out in sequence.
3. Maintenance of the tool holder.
4. Maintenance of the tailstock.
5. Maintenance of lubrication system
6. Maintenance of electrical appliances
7. Appearance maintenance. Firstly, clean the surface and cover of the CNC drilling machine, keeping its interior and exterior clean and free of oil stains. Secondly, check
And complete all screws and handles. After cleaning and wiping, lubricate all components as necessary. When maintaining the machine, it is important to note that the power supply must be cut off and the maintenance must be carried out step by step.
·what are the safety matters of the processing center? ·CNC vertical processing center advantages analysis ·The basic working principle of CNC machine tool processing ·Discuss the advantages of technical and economic aspects of stamping hardware processing ·What is the machining principle of CNC horizontal machining center for single arm drilling and tappi ·Precautions for difficult to machine materials in cutting processing ·The problem of rough opening of CNC front mold ·Tool selection and maintenance of CNC machine tools ·The application range of hardware processing hardware products? ·Explain the benchmark selection for machining center positioning?