The vertical processing center needs to carefully conduct a debug test vehicle in both the factory or at the installation site, because the purpose of the machine tool debugging is to verify whether the processing center is stable and whether the systems such as transmission, manipulation, and control are normal and sensitive. Therefore, the debugging steps of the machine tool are very important. Let's take a look at the debugging steps of the next processing center?
Generally speaking, the debugging test operation of the vertical processing center needs to follow the following steps:
1. Follow the requirements of the instructions to refuel the lubrication points of the vertical processing center, and pour the hydraulic oil required to the hydraulic fuel tank to connect the gas source. CNC processing center machine tool
2. Power on the establishment of the establishment of the establishment of the type of machining, the power supply of each component or the power supply of each component, and then fully power supply. Observe whether each component is alarm, whether the manual components are observed normally, and whether each safety device works. The links can be operated and exercised. CNC processing center machine tool
3. After the preliminary operation of the vertical processing center, the geometric accuracy of the coarse machine tool is adjusted to adjust the relative position of the main movement components and the host. Find the robotic hand, knife library, switching workbench, location, etc. After these tasks are done, you can use fast -drying cement to irrigate the host and the ground feet bolts of each attachment to reserve the foot bolts in various places.
4. Debug, prepare various testing tools, such as precision levels, standard square ruler, parallel square tube, etc. CNC processing center machine tool
5. The level of refined machine tools enables the geometric accuracy of the vertical machining center to reach the range of allowable errors. It is supported by multiple dot pads. In a free state, the bed body is adjusted to ensure the stability of the bed after adjustment.
6. Adjust the robot's position on the main axis by manual control, and use the adjustment of the heart stick. When installing the maximum weight of the knife handle, it is necessary to automatically exchange from the blade to the spindle position multiple times, so as to be accurate and not impact.
7. Move the workbench of the stand -up processing center to the exchange position, adjust the relative location of the tray station and the exchange workbench, reach the stable automatic exchange movement of the workbench, and install the maximum load of the workbench for multiple exchange.
8. Check whether the setting parameters of the CNC system and a programmable controller PLC device conform to the prescribed data in the random data, and then test the main operating functions, security measures, and the execution of common instructions. CNC processing center machine tool
·What are the characteristics of the processing of high precision parts of CNC machine tools ·Classification of CNC Machine Tools for Aluminum Profile Highlighting Machine ·Detailed explanation of the operation points of the processing center ·CNC maintenance ·What is the working principle of the vertical processing center ·The Important Factors of CNC Machine Tool Spindles in Vertical Machining Centers ·Five Key Points of Hardware Powder Spraying Operation ·Analysis of external fault maintenance of CNC lathes processing CNC lathe system? ·What is the application scope of metal aluminum die-casting so wide · What are the differences between aluminum profile processing center and ordinary processing center?